Feeds:
Posts
Comments

Archive for August 12th, 2010

The following are the three, current designs proposed for the pedestrian bridge. Engineering and design work is ongoing. Expected completion date is 2015.

Alternative One:

Alternative Two:

Alternative Three:

Advertisements

Read Full Post »